Technical Report TR/80
Migrating to CSTA Phase III
(June 2000)
The purpose of this Technical Report is to aid the transition to
CSTA Phase III
by those who are already familiar with Phases I and II.
Phase III of CSTA extends the previous Phase II Standard in major theme directions as well as numerous details. Major areas of advancement include:
- Additional services and events for call and device control.
- Enhancement to existing services and events.
- Organisation of services and events to reflect a grouping based on function (call control, device control, etc.)
- Use of a consistent template for services and events that includes initial/final Connection State, connection state transitions, event monitoring sequences, etc.
The following file can be freely downloaded:
| File name |
Size (Bytes) |
Content |
| TR-080.pdf |
170 214 |
Acrobat (r) PDF file |
Back